Columbus, Ohio

Wiring up the house

I started working on wiring up the house. I don’t have much time lately to actually run the wiring, but I did get a couple hours last weekend to build a rack for my network cabling.

Directions
I got some wood at Lowes pre-cut. I got 2 1x10x48″ and 1 1x10x72″ lumber, 1 5/8″ drywall screws, and 6 bolts with nuts and washers. I cut drilled 3 holes 3/4″ from the top of each of the 48″ pieces. Each hole is 3″ apart with the center at the center of the lumber. I then cut the 72″ board 4 times giving me 4 pieces each 17-13/16″ in length (the width between the outsides of 2 joist. I drilled the same holes into the joist to mount the vertical portions of the shelf. Then I placed the smaller boards as shelves where I wanted them. I turned the 4th shelf into a backing between the 2nd and 3rd shelf so I had a surface to mount my mini patch panel.

One Response

Comments are closed.

Join My FREE Newsletter

Get the latest news and episodes of the Cloud Entrepreneur Podcast and Angelo’s development blog directly in your inbox!